Perhitungan Volume Overburden Weekly Pada Pit 72 Menggunakan Sofware Surpac 6.3 di PT Unirich Mega Persada Kecamatan Teweh Baru Kabupaten Barito Utara Provinsi Kalimantan Tengah
Abstract
Coal mining in Indonesia generally employs an open-pit mining system, where overburden—consisting of soil or rock layers that cover the coal seam—must be removed first. In the coal mining process, there are several layers of earth: the first layer includes topsoil and subsoil, the second consists of sand and overburden, and the final layer is coal. Overburden is considered a non-valuable material that must be excavated from the pit in order to access and extract the coal. This research aims to calculate the weekly volume of overburden in Pit 72 using RTK (Real Time Kinematic) equipment and Surpac 6.3 software. Weekly surveys were conducted to collect coordinate data (X, Y, Z), which were then processed in Surpac 6.3 to generate volume area calculations. The results show variations in the overburden volume moved each week, with a total area of 181,903.00 m² and a total overburden volume of 351,141.00 BCM over one month of observation. When compared to the monthly overburden production target of 375,000.00 BCM, the actual realization falls short. Weather conditions, haul road quality, and equipment efficiency are the main factors affecting production performance. This study demonstrates that the use of RTK and Surpac 6.3 provides more accurate and efficient measurement results compared to manual methods. This evaluation is essential for decision-making in mine progress management. Therefore, weekly volume calculations are highly valuable for monitoring production targets and enhancing the operational efficiency of the mine
References
Desti Arini Putri, Restu Utama, Noveriady. (2024). Pengamatan Kegiatan Survei Topografi Arah Kemajuan Tambang PT. Rimau Energy Mining. Jurnal teknik pertambangan (JTP) vol: 24, No : 2, Agustus 2024, Halaman 86-91.
Fitriono, A. (2017). Geodetik Dengan Metode Real-Time Pendidikan Teknik Bangunan Universitas. Geodetik Dengan Metode Real-Time Pendidikan Teknik Bangunan, Semarang
GEMCOM INC Sofware, 1997, Geological Modeling Of A Multi-seam Coal Deposite With Surpac Software, Campbell
Hasvah Rahmi dan Riko Maiyudi. 2021. Perbandingan Volume Overburden Berdasarkan Data Survey dengan Data Truck Count pada Pit Section 2 Timur PT Budi Gema Gempita Kabupaten Lahat, Sumatera Selatan. Jurnal Bina Tambang, Vol.6, No.5
Kivli Manik, Frandes, d.k.k. 2022. Perbandingan Perhitungan Volume Overburden Yang Terbongkar Antara Metode Truck Count Dan Metode Survey Pada PT Bara Adhipratama Ulok Kupai Job Site Bengkulu Utara. Jurnal Ruang Luar dan Dalam FTSP – vol. 04 no. 02 edisi November 2022.
Kurnia, M.A., Saismana, U., Santoso, E., Yunizar., G., 2015. Evaluasi Penambangan Di PIT 3 Berdasarkan Pengukuran Survey Kemajuan Tambang Terhadap Ritase Alat Angkut (Truck Count) Pada PT. Tanjung Alam Jaya Kecamatan Pengaron, Kabupaten Banjar, Kalimantan Selatan, Junal Geosapta, vol. 1, No. 1, 5-7
Muliadi, Anshariah, Nurliah Jafar. (2018). Pemetaan Kemajuan Penambangan Pada Pit X Daerah Morowali Provinsi Sulawesi Tengah. Jurnal Geomine, Vol. 6, No. 1
Ramli, A., Widodo. S., Nuurwaskito, A., (2017). Analisis Penambangan Kemajuan Batubara Menggunakan Software Dan Prismodoil Di Kalimantan Timur, Jurnal Geomine, Vol. 5, No.1. 19-23
Ristian Mades Vieri, Desi Syafriani, Dwi arini, & Defwaldi. (2023). Perbandingan kemajuan progress tambang batubara di Pt samantaka pada bulan juli-agustus tahun 2021 dengan bulan februari-maret tahun 2022. Vol 6 No. 1 page 413-430
Sepriadi, Mirza A., Rizky P., Putra. (2023). Analisis perbandingan kemajuan tambang progress tambang batubara di PT samantaka pada juli-agustus tahun 2021 dengan bulan februari-maret tahun 2022. Vol 6 No. 1 page 413-430
Suhairi, R., Nurhakim, Riswan, 2018. Evaluasi Kemajuan Tambang Bulanan Berdasarkan Metode Survey pada PT. XYZ, Jurnal Geosapta, Vol 4, No.1, 19-23.
Sujiman, Fransiskus X. 2023. Teknik Analisis Dan Perhitungan Volume Overburden Kemajuan Tambang PT. Putra Perkasa Abadi Menggunakan Surpac 6.3.2. Kecamatan Loa Kulu Kabupaten Kutai Kartanegara Provinsi Kalimantan Timur. Jurnal Geologi pertambangan vol. 27 no. 1
Syarifudin, A. (2020). Pemanfaatan Receiver GNSS RTK Smart TB5 Dengan Metode RTK-Ntrip Untuk Pengukuran Titik Batas Bidang Tanah. 2507(February), 1–9.
Triono dan Dina Islamiah, 2014. Perhitungan Kemajuan Tambang (Progress Mining) Dengan Metode Penampang Melintang, Di CV. Wulu Bumi Sakti Kecamatan Samboja Kabupaten Kutai Kartanegara Provinsi Kalimantan Timur, Fakultas Teknik Universitas Kutai Kartanegara, Kalimantan Timur. Jurnal Geologi Pertambangan Vol 2 No 16, September, 2014.
Copyright (c) 2025 Idah Ariyaini, Suratno, Roby Cahyadi

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.








